CLIENT: PT Tambang
PROJECT: PT Aneka Tambang
REGION: Indonesia
STATUS: Completed
SCOPE OF WORKS
Sinking of a main shaft
Ancillary development
SHAFT DIMENSIONS:
Depth: 320 metres
Finished diameter: 6.2 metres
SPECIAL ACHIEVEMENTS AND CHALLENGES
The project was situated on the top of a mountain thereby providing unique logistical challenges in getting equipment and materials to site.
Helicopters were used to transport all equipment and materials to the site.
The top of the mountain had to be levelled before sinking could commence.